Monday, August 29, 2011
I have refined the plan for the sub-floor. (by that I mean the area UNDER the floor of the sub). This new version changes what had been a "Grey Water Holding Tank" into what is now a "Fresh Water Holding Tank". Grey water is now piped directly to the outside. I have also added the exhaust line for the diesel engine.
   

Friday, August 26, 2011  
This is my first stab at planning out the sub-floor. That is to say, this is the begining of what things will look like under the main deck. This is where the high-pressure air tanks (6) for the ballast tanks will be located, as well as fuel lines, air hoses and water lines.
 

Tuesday, June 7, 2011
My first run at the plumbing on the sub. The ballast tanks will be piped directly to the outside to facilitate speedy flushing and filling. I am providing for both a fresh water supply and a flush (chemical) toilet, like airplanes use. The diver lockout chamber and the galley sink will drain direclty into the bilge.
   

 